Standard connection
For sites where the existing network is close by and standard equipment can meet your requirements.
Electricity work typically involves a new cable from the local distribution network. Gas work usually involves a service pipe from the main to your meter point.
Typically 5 to 30 working days
Most standard connections complete within this period, depending on the network operator and complexity of the site work. This is generally the fastest and least expensive route.